Capital Hair and Beauty required a new headquarters and training centre in Brighton, together with a trade counter and storage.

The new building provides 1000m/sq gross internal floor area over two floors. The building was designed with a portal steel frame to provide large open areas for maximum flexibility. The building scale and material pallet replicate the surrounding buildings. High levels of insulation together with PV panels helped to achieve a BREEAM Excellent rating.

Evolution were appointed by Sunninghill Construction to undertake detail design, secure building regulation approval and undertake construction drawings.

Exterior front view of commercial unit